Grid Emergency facilitator guide

    Allow 30 minutes. Use this exercise to practice load diagnosis, utility dispatch, communications, and a controlled restart.

    Open the exercise

    Learner instructions

    Act as the shift lead. Read the notice, then commit one action at each of four stages. Explain your curtailment and restoration choices. Use the same browser to resume your last committed decision. The practice timer continues across refresh, and expiry allows a late submission.

    Session plan

    1. Brief the role, meter reading, dispatch limit, and fixed overhead (5 minutes).
    2. Have learners complete the exercise and record their rationale (10 minutes).
    3. Replay from the curtailment decision. Compare targeted and deeper curtailment (8 minutes).
    4. Debrief the missed-target or premature-restoration path and export both attempts (7 minutes).

    Practice rubric

    • Diagnosis (25%). Reconcile the meter, inventory, and fixed site load.
    • Dispatch compliance (25%). Reach the 4.365 MW limit by T+45.
    • Communication (25%). Report verified load, variance, and follow-up.
    • Recovery (25%). Start at or after T+405 and add no more than 2 MW.

    Review the written rationale separately for evidence and trade-off reasoning.

    Facilitator reference runs and discussion prompts

    Use meter and fleet reconciliation and a verified utility update in each run.

    • Targeted response: keep 1,000 group C miners online, then restart 400 group B miners after release. Load moves from 3.790 MW to 5.110 MW. Score 100.
    • Deeper response: stop the entire fleet, then restart 400 group B miners after release. Load moves from 0.690 MW to 2.010 MW. Score 100.
    • Missed response: keep 1,400 group C miners online, then restart 400 group B miners at T+390. Load moves from 5.030 MW to 6.350 MW. Score 50.

    Ask learners which response creates more headroom, what evidence belongs in the utility update, and why identical restoration increments can lead to different compliance results. Compare modeled electricity cost and offline miner-hours separately from the competency ratings.